United Kingdom
The United Kingdom has been a pioneer in hydropower development, using water for electricity generation since 1879. Today the UK has a total hydropower installed capacity of over 4.5 GW. The vast majority of installed capacity is located in the wet and mountainous regions of Wales and northwest Scotland.
Corrimony
Operation data
Installed capacity: 500 kW
Head: 79,25 m
No. of turbines: 1
Annual generation: 1 780 MWhFassfern
Operation data
Installed capacity: 500 kW
Head: 220 m
No. of turbines: 1
Annual generation: 1 780 MWhBarton Locks
Operation data
Installed capacity: 690 kW
Head: 4.5 m
No. of turbines: 1
Annual generation: 1 800 MWhBeeston Weir
Operation data
Installed capacity: 1400 kW
Head: 2.5 m
No. of turbines: 2
Annual generation: 7 000 MWhAllt Ruigh Mhoir
Operation data
Installed capacity: 500 kW
Head: 151,5 m
No. of turbines: 1
Annual generation: 1 510 MWhCorrimony Farm
Operation data
Installed capacity: 450 kW
Head: 123,7 m
No. of turbines: 1
Annual generation: 1 256 MWhLoch Eil
Operation data
Installed capacity: 500 kW
Head: 180 m
No. of turbines: 1
Annual generation: 1 720 MWhChesthill
Operation data
Installed capacity: 300 kW
Head: 336 m
No. of turbines: 1
Annual generation: 1 256 MWhAllt Caol
Operation data
Installed capacity: 500 kW
Head: 160 m
No. of turbines: 1
Annual generation: 1 256 MWhAfon Las
Operation data
Installed capacity: 100 kW
Head: 137 m
No. of turbines: 1
Annual generation: 450 MWhLedcharrie
Operation data
Installed capacity: 500 kW
Head: 175 m
No. of turbines: 1
Annual generation: 2 055 MWhACNL
Operation data
Installed capacity: 500 kW
Head: 245 m
No. of turbines: 1
Annual generation: 1 675 MWhGlenridding
Operation data
Installed capacity: 500 kW
Head: 135 m
No. of turbines: 1
Annual generation: 1 250 MWhPhiliphaugh
Operation data
Installed capacity: 2x132 kW
Head: 2,63 m
No. of turbines: 2
Annual generation: 915 MWhStanley Mills
Operation data
Installed capacity: 840 kW
Head: 6,55 m
No. of turbines: 1
Annual generation: 3 400 MWhSrath Chombuill
Operation data
Installed capacity: 500 kW
Head: 37,5 m
No. of turbines: 1
Annual generation: 1 968 MWhGlen Duror
Operation data
Installed capacity: 690 kW
Head: 95 m
No. of turbines: 1
Annual generation: 2 192 MWhYstradffin
Operation data
Installed capacity: 1 800 kW
Head: 45 m
No. of turbines: 2
Annual generation: 8 143 MWhNether
Operation data
Installed capacity: 120 kW
Head: 1.7 m
No. of turbines: 1
Annual generation: 700 MWhWoolston
Operation data
Installed capacity: 486 kW
Head: 2.2 m
No. of turbines: 2
Annual generation: 2 100 MWhMode Wheel
Operation data
Installed capacity: 364 kW
Head: 3.9 m
No. of turbines: 1
Annual generation: 1 600 MWhIrlam
Operation data
Installed capacity: 509 kW
Head: 4.9 m
No. of turbines: 1
Annual generation: 3 700 MWhLogan Gill
Operation data
Installed capacity: 477 kW
Head: 90.2 m
No. of turbines: 1
Annual generation: 1 400 MWhFisher Place
Operation data
Installed capacity: 468 kW
Head: 211.5 m
No. of turbines: 1
Annual generation: 1 300 MWhGleann Dubhlinn
Operation data
Installed capacity: 100 kW
Head: 77.7 m
No. of turbines: 1
Annual generation: 300 MWhBunavoneader
Operation data
Installed capacity: 100 kW
Head: 25.2 m
No. of turbines: 1
Annual generation: 400 MWhDutton
Operation data
Installed capacity: 160 kW
Head: 2.5 m
No. of turbines: 1
Annual generation: 900 MWhHowley Weir
Operation data
Installed capacity: 160 kW
Head: 2.2 m
No. of turbines: 1
Annual generation: 800 MWh
Construction projects
Eastham
Operation data
Installed capacity: 594 kW
Head: 4.5 m
No. of turbines: 2
Annual generation: 2 000 MWh